Thứ sáu, 03/12/2021Hotline: 0816 886 786Quảng cáo

The “metro” dream becomes closer to HCMc’s citizens

(VLR) Metro Route 1 - one of the urban railway lane belonging to HCM rail system - has been almost completed when the carriages are sequentially received into the stations among all welcomed and proud cheers of the HCMC’ leaders and citizens. When this route is put into operation, this could trigger the other routes in future. Then, the dream about a modern and comfort “Metro” subway become feasible to most HCMC’s citizens…

From early 2020, the Metro Route 1 constantly recorded several milestones during the building process

From early 2020, the Metro Route 1 constantly recorded several milestones during the building process

A modern public transport system

Metro Route 1 (from Ben Thanh to Suoi Tien) had officially started to be built on Aug 28th, 2012 with the total budget of $43,700 bilion VND. The project was invested by the Management Authority for Urban Railways (MAUR) and constructed by Hitachi Group (Japan).

This route is totally 19.7km long, running through District 1, Thu Duc city and Di An city (Binh Duong province) when starting from the Ben Thanh center station (District 1) and ending at Suoi Tien station (Thu Duc city). In total, it has 14 stations, including 3 underground stations (with 2.6km in length), 11 on-ground stations, and 1 metro depot in Long Binh. The Metro Route 1 has 17 trains, including 3-car TRANSPORT INFRASTRUCTURES VIEW train type at the first phase and 6-car train type at later phases, that are all imported from Japan. Each 3-car train is 61.5m long after fully assembled and can carry 930 passengers (standing, sitting) with a speed of 110km/h (through on-ground stations) and 80km/h (through underground stations).

These trains are designed with an air conditioner system, a radio control system, an automatic operation system and the surveillance system to track the train route automatically. The train body is made of aluminum alloy and fully equipped to support passengers in case of emergency. They are also prepared with many supporting tools that are friendly for disability, priority seats for the elderly and pregnant women…

The train interior is d e c o r a t e d with the simple structure and efficient functions for the daily use and easily cleaning or maintaining. An inside surface of the train is painted with the blue color that creates fresh and comfort feelings; the interior is silver grey that helps the train look brighter and cleaner.

The building of Metro has the enormously important role in the development of HCMC and Vietnam when the transport system is now overloaded with the current frequency of traffic jams and transport congestion.

The dream about the metro subway is quite close…

The project Metro Route 1 has been interfered by many difficulties from the beginning and delayed the progress due to some obstacles in amending the investment budget or technical design…

Dated Nov 13th, 2019, after the amendment evaluation, HCMC People Committee issued the Decision no. 4856/QD-UBND approving the Amendment for the project to build Metro Route.1 with the total budget of 43,700 billion VND, and directed the involving parties to speed up the project completion. In other words, this is an important untied point for this project to create the favorable conditions to accelerate the completion, so that people can sooner approach to one modern transport mean that is expected to improve the condition of public transport in this city.

From early 2020, the Metro Route 1 constantly recorded several milestones during the building process. In particular, on Feb 17th 2020, the project was officially opened the route from Ben Thanh station to Long Binh Depot (Suoi Tien). On Oct 8th, 2020, the first train with 3 cars was formally arrived at Khanh Hoi station (District 4) among the cheers and pride of all leaders and peoples of HCMC.

How is the metro route 1 operated?

Gemadept Corporation is the subcontractor of the main contractor Hitachi Group, who implements the bid package to deliver 51 carriages in 21.2m long, 3m wide, 4.19 high and 37kg. This deliver was started from Khanh Hoi station to Long Binh depot (District 9) with the total of 26km long.

Gemadept Corporation is the subcontractor of the main contractor Hitachi Group, who implements the bid package to deliver 51 carriages

Gemadept Corporation is the subcontractor of the main contractor Hitachi Group, who implements the bid package to deliver 51 carriages

To deliver one 37-ton carriage, Gemadept arranged to connect super-heavy and superlong cars with 12 axles that was 32m long and carry over 200 tons. To ensure the safety during the journey, they use a specialized fleet made in Germany and have a good signal system and a brake line connecting all the trailer axles and under the control of a hydraulic system with the minimum shock to help the convoy absolute balance while moving.

Delivering the super-heavy and superlong cargo is one special link in the comprehensive integrated Port-Logistics of Gemadept. Being one of Top 2 providers supplying the super-heavy and super-long transportation solutions in Vietnam, Gemadept is proud of their role participating in national key projects.

Hoai Nhan

Ý kiến bạn đọc

Chưa có ý kiến nào. Hãy là người để lại ý kiến đầu tiên.

Ý kiến của bạn

0

Tối thiểu 10 chữTiếng Việt có dấuKhông chứa liên kếtGửi bình luận

Vui lòng nhập mã bảo mật để gửi bình luận lên hệ thống
Gửi bình luận

Bà Rịa - Vũng Tàu: Đẩy nhanh hàng loạt dự án kết nối giao thông

Ngày 01/12/2021 lúc 09:35

Bà Rịa - Vũng Tàu đang được cho là có “tham vọng lớn” khi đầu tư xây dựng hệ thống giao thông của tỉnh, kết nối với các địa phương khác trong khu vực.

Tìm cơ chế thu hút vốn đầu tư vào đường sắt

1 Phút trước

Quy hoạch mạng lưới đường sắt thời kỳ 2021 - 2030, tầm nhìn đến năm 2050 vừa được Thủ tướng Chính phủ phê duyệt dành tổng nhu cầu vốn đầu tư hạ tầng 10 năm tới cho lĩnh vực này lên đến 240.000 tỷ đồng. Các chuyên gia kinh tế nhận định, để huy động đủ nguồn vốn này là bài toán không dễ dàng, cần tính toán kỹ và có cơ chế thu hút rõ ràng.

Sẽ xây dựng hầm đường bộ nối 2 tỉnh Lai Châu - Lào Cai

Ngày 30/11/2021 lúc 13:45

Dự kiến dự án xây dựng hầm đường bộ qua đèo Hoàng Liên được khởi công vào quý III năm 2022, hoàn thành và đưa vào khai thác giữa năm 2025. Dự án triển khai thi công xây dựng trên địa bàn huyện Tam Đường, tỉnh Lai Châu và thị xã Sa Pa, tỉnh Lào Cai.

ASEAN tạo điều kiện doanh nghiệp đầu tư, kinh doanh tại các tiểu vùng

22 Phút trước

Lần đầu tiên Việt Nam tổ chức Diễn đàn Cấp cao ASEAN về hợp tác tiểu vùng vì phát triển bền vững và tăng trưởng bao trùm cuối tháng 11 vừa qua, đã khẳng định những nỗ lực của Việt Nam trong việc thúc đẩy sự phát triển của các tiểu vùng trong ASEAN. Đồng thời, qua diễn đàn, cộng đồng ASEAN và Chính phủ các nước thành viên sẽ tạo điều kiện thuận lợi cho các doanh nghiệp trong và ngoài khu vực tiến hành đầu tư, kinh doanh tại các tiểu vùng của ASEAN.

Bắc Giang sẽ có khu công nghiệp gần 1.200 tỷ đồng

5 Giờ trước

Dự án đầu tư xây dựng và kinh doanh kết cấu hạ tầng khu công nghiệp Tân Hưng thuộc xã Tân Hưng và xã Xương Lâm, huyện Lạng Giang, tỉnh Bắc Giang có quy mô 105,3 ha, tổng vốn đầu tư 1.185 tỷ đồng. Trong đó, vốn góp của nhà đầu tư là 177,75 tỷ đồng; vốn huy động 1.007,25 tỷ đồng. Tiến độ thực hiện không quá 36 tháng kể từ ngày được Nhà nước bàn giao đất.

Nhiều doanh nghiệp cam kết góp vốn cùng Đèo Cả xây dựng cao tốc Đồng Đăng - Trà Lĩnh

Ngày 02/12/2021 lúc 08:26

Ngày 01/12, Tỉnh ủy Cao Bằng tổ chức cuộc họp trao đổi một số nội dung liên quan đến dự án đường bộ cao tốc Đồng Đăng (Lạng Sơn) - Trà Lĩnh (Cao Bằng) và các dự án công nghiệp, trung chuyển thương mại dịch vụ trên địa bàn.

Thời tiết

Hiện tại

°

Nguồn: Weathers Underground

Tỷ giá ngoại tệ

Tỷ giá ngoại tệ cập nhật vào 26/09/2021 17:45
Mã NTTiền mặtChuyển khoảnBán
AUD16,185.9316,349.4216,862.19
EUR26,044.7926,307.8727,400.28
GBP30,430.7030,738.0831,702.11
JPY200.85202.88212.47
SGD16,438.0016,604.0417,124.79
THB603.27670.30695.48
USD22,630.0022,660.0022,860.00
Nguồn: Vietcombank

Giá xăng dầu

Giá xăng, dầu cập nhật ngày 26/09/2021 11:15
Loại xăng dầuĐơn vịGiá vùng 1Giá vùng 2
Dầu hỏaVND/L1564015950
DO 0,001S-VVND/L1693017260
DO 0,05SVND/L1658016910
Xăng E5 RON 92-IIVND/L2071021120
Xăng RON 95-II,IIIVND/L2194022370
Xăng RON 95-IVVND/L2204022480
Nguồn: Petrolimex
Roles of Freight Forwarding Agencies and Logistics Service Providers

Roles of Freight Forwarding Agencies and Logistics Service Providers

Ngày 30/11/2021 lúc 09:28

However, many manufacturing and import-export enterprises, even some managers of related sectors, think that this is just simply...